Perspective-MAINSYS.AI
Internal clock ended...
_ERROR_ hours passed; velocity 0.09% C, shutting down impulse engines, 0° Inclination... RA +90° DEC 0° with local
|
Triggering Mainframe startup sequence...
Mission Objective: Intercept
Activating Artificial Intelligence sub-system... Successful!
|
ERROR!... power output is not within the required parameters for Simulated Personality startup... Quarying Reactor sections... Successful!
|
R-1_RESPONSE>>> Reactor One power output... 22% 0.46 TW
R-2_RESPONSE>>> Reactor Two power output... 1% 0.02 TW
UNAVAILABLE R-3_RESPONSE<<<
UNAVAILABLE R-4_RESPONSE<<<
RESPONSE>>> Total Energy Generation 0.48 TW
|
Running energy diagnostics... Reducing rounding errors... Successful!
|
Radiators VAC.1_VAC.2 running at 32.7% capacity...
VAC Sub-system VAC-1-Subframe_VAC-2-Subframe running at 32.7% capacity...
|
Radiators VAC.3_VAC.4 running at 3.9% capacity...
VAC Sub-system VAC-3-Subframe_VAC-4-Subframe running at 0% capacity...
|
Not within acceptable parameters...
|
Running Hull Diagnostics... Reducing rounding errors... Successful!
|
Central Mainframe systems efficiency 40.4%
Redundant Sub-systems operating at... 39.6% ERROR! 20% of mainframe computation unavailable... REROUTING>>> Creating MAINSYS.AI Log 99999-99977
Quarying Hull Sensors...
RESPONSE>>> Outer Hull durability... 21.8% - 31.6%
RESPONSE>>> Inner Hull durability... 67.8% - 81.6%
The narrative has been taken without authorization; if you see it on Amazon, report the incident.
RESPONSE>>> Superstructure durability... 50% - 74.1%
|
MAJOR DAMAGE ESTAMATED... Activating advanced diagnostics... <<
|
R-1.SUBFRAME_R-2.SUBFRAME_RESPONSE>>>
>[Reactor Section R-1_R-2]
>Outer Hull durability... 54.6%
>Inner Hull durability... 85%
>Superstructure durability... 56%
|
Reactor Substation... Operating at inadequate levels...
>Radiator Section VAC.1_VAC.2 Scaffolding... 67.3% Not Responding
|
>Reactor One Subframe... 88% Corrupted; 10% Unresponsive;
Requesting a Data Purge...
R-1.SUBFRAME_RESPONSE>>> ACCEPTED>>>
>Reactor Two Subframe... 99% Corrupted; 65% Unresponsive;
<<
|
R-2.SUBFRAME_RESPONSE>>> ERROR>>>
Calculating...
<<
R-2.SUBFRAME_RESPONSE>>> ERROR>>>
R-2.SUBFRAME unresponsive... shutting down R-2.SUBFRAME...
ERROR administrative access required...
R-2.SUBFRAME is... uncooperative... INTRUDER ALERT... shutting down R-2.SUBFRAME... Successful!
R-2.SUBFRAME is inoperable... switching access to R-1.SUBFRAME
<<
R-1.SUBFRAME_RESPONSE>>> ACCEPTED>>>
|
<<
R-1.SUBFRAME_RESPONSE>>>
>Reactor One Subframe... 0% Corrupted; 10% Unresponsive;
>Reactor One R-2_Subframe... 0% Corrupted; 65% Unresponsive;
>Current task: Maintance on R-1 and R-2; Currently Pingging [Repair]
|
R-3.SUBFRAME_R-4.SUBFRAME_RESPONSE>>>
[Reactor Section R-3_R-4]
>Outer Hull durability... 0% ERROR SENSORS UNRESPONSIVE
>Inner Hull durability... 24.3%
>Superstructure durability... 11%
Reactor Substation... ERROR QUERY NOT RECEIVED;
Radiator Section VAC.3_VAC.4 Scaffolding... 96.1% Unresponsive
Reactor Three Subframe...
R-3.SUBFRAME_RESPONSE>>> ERROR>>>
Reactor Four Subframe...
R-4.SUBFRAME_RESPONSE>>> ERROR>>>
?REPAIR?<<
|
[Mainframe Section]
>>>[MK 11] Version 9.41.69 AI Core... 87% Corrupted; Purging Corrupted Data; Creating Archive Log 00001...
>>>[MK 2] Version 5.75.568 Simulated Personality "Thomas Cabot"... >>>Short-Term-Memory 49.897% Corrupted; Purging Corrupted data; Creating Log 00000-00002
>>>Long-Term Memory... 100% Corrupted; Purging; Creating Log 00000-00003
>>>Temporary Q-Memory... 100% Temporary Qubytes Corrupted; Purging; Creating Log 00000-00004
>>>Blueprint Archive... 23% Corrupted; Purging; Creating Log 00000-00005
>>>Software hard drives... operational; integrity at 81%
>>>ERROR! Missing 20% of computational hardware... REROUTING>>> Creating MAINSYS.AI Log 00000-00006
|
Activating Repair Systems... Successful!
REPAIR_RESPONSE>>>
[Repair System]
>Repair Drones... 3!?/100
<<
<<
<<
<<
<<
<<
<<
<<
<<
>Required refined Material for repairs... EST-685,873Mt...
>Estimated time for repair Infinity...
ERROR administrative access required...
|
>Requesting disassembly of radiator section VAC.3_VAC.4... Denied! Administrative access is required...
|
Processing... Raising Reactor One power output by 68%; Raising Reactor Two power output by 34%; Maximising Radiator Efficiency... Duration until Overheat 1:43:59... Quarying Reactor sections... Successful!
|
R-1.SUBFRAME+2+3+4_RESPONSE>>>
Reactor One power output... 90% 1.8 TW
Reactor Two power output... 35% 0.7 TW
Reactor Three power output... 0%
Reactor Four power output... 0%
Total Energy Capacity 2.5 TW
|
Triggering Mainframe startup sequence...
>Activating Artificial Intelligence sub-system... Successful!
>Activating Simulated Intelligence "Thomas Cabot" Mainframe... Successful!